TPSDI

TPSDI News & Programmes -

  • TPSDI trains "Ethiopian Electric Utility" Employees on Power Distribution S/s program for USEA-USAID   Read more...
  • TPSDI takes steps to bridge the Industry Academia Gap   Read more...
  • How TPSDI Shahad got its Bus Stop ?   Read more...
  • Certification course on Safety and Design Aspects of Electrical Inst. for Diploma & Graduate Engrs.   Read more...
  • Mr. Sanjay Bhandarkar (Independent Director - Tata Power Board), visits TPSDI Trombay   Read more...

Programs & Courses

HomePrograms & CoursesInstallation of Power Transmission Underground Cable Network

Installation of Power Transmission Underground Cable Network bACK

Learning Outcomes

  • To plan cable system including route survey, cable selection, procurement and preliminary approvals.
  • Capability to execute EHV Cable laying with safe practices.
  • Ability to undertake and oversee cable jointing, testing and commissioning.
  • Knowledge of applicable Code of Practices in EHV Cable laying and termination.
  • To carryout routine checks and trouble shooting.

Note: TPSDI reserves the right to cancel or reschedule training at any time

TPSDI Shahad

  • To be announced

TPSDI Trombay

  • To be announced

TPSDI Jojobera

  • To be announced

TPSDI Mundra

  • To be announced

TPSDI Maithon

  • To be announced

  • Personnel from Power Utilities, Power Generation, transmission companies & industries and Consultants responsible for engineering, commissioning, operation and Maintenance of EHV Cable network.
  • EHV Cables - Basic concepts, constructional features, types, selection and rating.
  • Design aspects of underground cable system - Route survey, location of joint bays including Link Box, Earthing System and necessary approvals.
  • Applicable Code of Practices and Standards for EHV Cable System.
  • Cable Laying, jointing and termination procedure.
  • Testing and commissioning checks.
  • O & M and Troubleshooting, fault location and rectification.
  • Current trends on monitoring the healthiness of cable system.
  • Discussion on Case studies.
24 hours spread over 3 days